Performance Of Toe-Grouted Large Bored Pile In Sand-Gravel Formation Of Chiang Mai City, Northern Thailand

Thasnanipan, Narong
Organization: Deep Foundations Institute
Pages: 8
Publication Date: Jan 1, 2002
Performance of diameter 1.5 m toe-grouted bored pile founded at depth 44 m in sand-gravel formation of Chiang Mai City is presented in this paper. Toe grouting was applied by using tube-a-manchette method. Effectiveness of toe grouting was observed from the standard penetration tests conducted immediately below pile toe through grouting pipes at two stages, prior to grouting and three weeks after completion of grouting. Improvement of pile end resistance by toe-grouting is demonstrated with a series of back analyses carried out by load-transfer method employing hyperbolic transfer function. Construction experience of large diameter deep-seated bored piles in multi-layered subsoil and practical aspects of toe-grouting are also briefly discussed.
Full Article Download:
(281 kb)