Tied-Down Boat Section Construction

Micciche, Romano J.
Organization: Deep Foundations Institute
Pages: 19
Publication Date: Jan 1, 1994
One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate Highway Route I-90 southern approach roadway to the Third Harbor Tunnel, in Boston, Massachusetts. Site specific information is discussed regarding design, testing, and installation of Tiedowns. Conclusions are presented regarding the overall performance of this system and the application of this type of tiedown system on future projects.