Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment Description

Abiassi, Jean J.
Organization: Deep Foundations Institute
Pages: 5
Publication Date: Jan 1, 1994
The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach to the Third Harbor Tunnel crossing. The alignment is approximately 2500 Ft long and is made up of four sections starting from west to east: 1. West Tunnel 2. Boat Section 3. East Tunnel 4. Tunnel inside Vent 6 Cofferdam and connection to the Third Harbor Tunnel. The support of excavation (SOE) system for the West Tunnel, Boat Section, and East Tunnel are all a part of this project whereas the SOE for Tunnel inside the Vent 6 Cofferdam was a part of the contract for the Third Harbor Tunnel.
Full Article Download:
(281 kb)